Compact Once-through Steam Boiler

OT-750Gi

Steady output,
sized to production.

750 kg/hr equivalent evaporation, with intuitive controls, fast startup and parallel operation for reliable continuous production.

OT-750Gi Gas-fired Steam Boilers— front view
Rated evaporation750kg/hr
Max. working pressure10kg/cm²
Max. efficiency90%
Time to steam4–5minutes

Highlights

Simple to run, day after day.

OT-750Gi integrates startup, monitoring and safety controls in a clear interface for varying loads and long production runs.

  1. 01Fast Startup

    Steam about 4–5 minutes after ignition.

  2. 02Saves space

    Compact once-through design, heating surface 9.92 m².

  3. 03Parallel Operation

    Run more or fewer units as load changes, and keep steam during maintenance.

  4. 04Colour touchscreen

    Touch control showing operating status and fault history.

  5. 05Optional economiser

    Boiler efficiency 88%, up to 90% with an economiser.

  6. 06Safety controls

    Safety valve 40 A, with full safety devices and controls.

Interface and details

Installations

OT-750Gi Specifications

The economizer recovers flue-gas heat to reduce fuel use. Actual savings depend on load and operating conditions.

SpecStandardWith economizer
Rated evaporation750 kg/hr
Actual evaporation626 kg/hr
Heat output404,250 kcal/hr
Efficiency88%90%
Fuel consumptionLNG 46.3 Nm³/hr
LPG 37.4 kg/hr
LNG 42.5 Nm³/hr
LPG 35.1 kg/hr
Power2.4 kW
Fuel inlet50 A
Flue size300 mm
Feedwater inlet20 A
Steam outlet50 A
Blowdown25 A
Safety valve40 A
Heating surface9.92 m²
DimensionsW1,200 × D1,600 × H2,215 mmW1,200 × D1,750 × H2,215 mm
Weight1,450 kg
Test conditions & notes
  1. Actual evaporation is based on feedwater at 15°C and saturated steam at 0.49 MPa.
  2. Boiler efficiency is calculated by the JIS B 8222-1993 heat-loss method. Efficiency tolerance: ±1%; combustion capacity tolerance: ±3.5%.
  3. Fuel consumption is calculated using the specified lower heating value. Actual gas heating value and supply pressure affect the result.
  4. Gas piping must maintain adequate pressure while the boiler and other equipment operate. Supply pressure range: 0.03–0.3 MPa.
  5. With an economizer, a feedwater temperature of at least 50°C is recommended.
  6. Specifications may change as products improve. Refer to the latest technical information from Chuang Ting for final selection.

Check whether OT-750Gi suits your site.

Share your connected equipment, steam demand, operating hours and site conditions so our engineers can confirm capacity and system configuration.

Call us · Kaohsiung headquarters+886-7-787-2258