Compact gas-fired once-through steam generators
MG-250iE
Compact. Quick to connect.
250 kg/hr equivalent evaporation, with an integrated economizer and color HMI for individual machines, kitchens and space-constrained processes.

Highlights
The right model needs the right system layout.
Chuang Ting considers connected equipment, load variations, energy supply, operating hours and space together. A single specification cannot replace a complete engineering assessment.
- 01Compact Once-through
Simple, compact once-through design.
- 02Stainless on four sides
MG series: stainless steel on all four sides.
- 03HMI 2.0
Colour touchscreen that logs runs and faults.
- 04Fast Startup
Steam about 4–5 minutes after ignition.
- 05Economizer included
Recovers flue-gas heat to cut fuel use.
- 06Direct connection
Connects straight to the equipment that uses the steam.
Interface and details
Installations
Selection data
Confirm requirements before final specification.
Values on this page support preliminary comparisons. Final configuration depends on pressure, load, energy supply, regulations and installation conditions.
- Rated evaporation
- 250 kg/hr
- Max. working pressure
- 10 kg/cm²
- Efficiency
- Over 90%
- Startup time
- Approximately 4–5 minutes
Check whether MG-250iE suits your site.
Tell our engineers about connected equipment, steam or hot-water demand, operating hours and site conditions to confirm capacity and system configuration.