Compact gas-fired once-through steam generators

MG-350iE

Compact. Quick to connect.

350 kg/hr equivalent evaporation, with an integrated economizer and color HMI for individual machines, kitchens and space-constrained processes.

MG-350iE Steam Generators— equipment photograph
Rated evaporation350 kg/hr
Max. working pressure10 kg/cm²
EfficiencyOver 90%
Startup timeApproximately 4–5 minutes

Highlights

The right model needs the right system layout.

Chuang Ting considers connected equipment, load variations, energy supply, operating hours and space together. A single specification cannot replace a complete engineering assessment.

  1. 01Compact Once-through

    Simple, compact once-through design.

  2. 02Stainless on four sides

    MG series: stainless steel on all four sides.

  3. 03HMI 2.0

    Colour touchscreen that logs runs and faults.

  4. 04Fast Startup

    Steam about 4–5 minutes after ignition.

  5. 05Economizer included

    Recovers flue-gas heat to cut fuel use.

  6. 06Direct connection

    Connects straight to the equipment that uses the steam.

Interface and details

Installations

Selection data

Confirm requirements before final specification.

Values on this page support preliminary comparisons. Final configuration depends on pressure, load, energy supply, regulations and installation conditions.

Rated evaporation
350 kg/hr
Max. working pressure
10 kg/cm²
Efficiency
Over 90%
Startup time
Approximately 4–5 minutes

Check whether MG-350iE suits your site.

Tell our engineers about connected equipment, steam or hot-water demand, operating hours and site conditions to confirm capacity and system configuration.

Call us · Kaohsiung headquarters+886-7-787-2258