Site needs
Four things to settle before planning.
No downtime
Multiple units back each other up and keep steam flowing during maintenance.
Limited plant room
Compact units and tidy piping, with room left for servicing.
Stable pressure
A full PRV station: main valve, gauges on both sides, bypass and isolation valves.
Traceable
HMI 2.0 logs pressure, temperature, water level, and the time and conditions of every fault.
Recommended equipment
Typical equipment.
The exact models and unit count depend on steam load, peak hours, fuel and space.
Showcase
Five-star hotel, Xinyi District, Taipei
- 4 steam generators
- Roll-in steam cabinets and rotary kettles
- Site-wide steam piping and PRV station
- HMI 2.0 run and fault logging
Related
Related articles.
Start with a site assessment.
Tell us your hotel's steam load, hours and space, and our engineers will assess the site.
Call us · Kaohsiung headquarters+886-7-787-2258
