Featured case · Five-star hotel, Xinyi, Taipei
High standards demand a stable system.
The hotel's kitchen service, cooking quality and peak hours all rely on one steam system. The work was less about equipment than about how the whole system is integrated and controlled.
- Steam source
- 4 steam generators
- Equipment
- Roll-in steam cabinets and rotary kettles
- Piping
- Site-wide steam piping · trap and drain layout
- PRV station
- Main PRV · pressure gauges both sides · bypass · isolation valves
- Controls
- HMI 2.0 logging pressure, temperature, water level and every fault
Showcase Gallery
See our engineering capability in the field.
Filter by industry and engineering content and click on the photo to browse in full screen.
37 site photos
Our engineering standard
Installation is the start. Steady operation is the result.
- StableMaintain the steam conditions required for the process even when the load changes
- EfficientThe number of equipment and energy usage are close to the actual needs of the site.
- ServiceableReserve space for operation and maintenance, and establish long-term service paths
Your project starts with your site.
Tell us the production capacity, steam usage period and space conditions, and the Chuang Ting engineering team will assist with on-site assessment.